Office projects
Relocation of SRS Department
Location: Edinburgh
Summary: Extension, alterations and fit-out works to part of a Grade B listed university facility to provide office accommodation
Description of Works: Extension, alterations and office fit-out works to an existing disused Boiler House within an operational Category B listed university facility to form accommodation for the Social Responsibility and Sustainability Department.
Works included:
- strip out and removal of existing floor, wall and ceiling finishes as well as downtaking of existing structural walls, staircases and localised areas of upper floors.
- structural works including the formation of new openings through load bearing walls with new lintels and steel beams and the creation of a new opening in the existing upper floor to accommodate a new staircase
- roof works including the removal of pitched roof coverings to inspect the existing roof, the renewal of slates as required/leadwork and the replacement of an existing cupola and creation of two new velux windows
- existing windows were upgraded
- internal partitions and doors
- suspended and plasterboard ceilings
- raised access floors
- floor finishes including carpet and vinyl
- paint finish throughout
- fixtures and fittings including fixed furniture, shelving, signage and kitchen facilities
- mechanical installations including the installation of disposal systems, hot and cold water, LTHW heating systems, comfort cooling and ventilation including integration to the University BMS system
- electrical installations comprising mains and distribution, small power, fire alarm, general and emergency lighting, door access, telephone and data installations and containment.
- a new platform lift was installed.
See more of our office projects
We have a wide range of projects like this one in our portfolio
Office Rationalisation Edinburgh
Location: Edinburgh
Summary: Phased office alterations and fit-out works.
Description of Works: Phased alteration and fit-out works within 3 operational local authority office buildings within Edinburgh.
Summary: Phased office alterations and fit-out works.
Description of Works: Phased alteration and fit-out works within 3 operational local authority office buildings within Edinburgh.
Administration & Welfare Block
Location: Ayr
Summary: New build 2-storey office and welfare building.
Summary: New build 2-storey office and welfare building.
Alterations to Arrochar House
Location: Livingston
Summary: Phased alterations and fit-out of office space.
Summary: Phased alterations and fit-out of office space.