Sports and leisure projects
Sports Pavilion
Location: Ormiston
Summary: Design and construction of new sports pavilion
Description of Works: Design and construction of a new sports pavilion together with the demolition of the existing pavilion and associated hard and soft landscaping.
The pavilion provides 2 changing areas with showers and toilets, club room with kitchen facilities, storage areas and a medical room.
Works included:
- demolition
- utilities installation
- concrete floor slab
- timber frame
- timber and rainscreen cladding
- partition walls
- doors, windows and curtain walling
- M&E works including power, lighting, heating, ventilation and alarm systems
- floor finishes including vinyl and carpet
- painterwork
- fixtures and fittings including kitchen and bench seating
Community Benefits:
Our Construction Director and Go Construct Construction Ambassador provided careers events at Dunbar Grammar school including interview preparation and a series of mock interviews.
See more of our sports and leisure projects
We have a wide range of projects like this one in our portfolio
Sports Pavilion, Ormiston
Summary: Design and construction of a sports pavilion
Alterations to Time Capsule Coatbridge
Summary: Refurbishment and alterations to existing dry sports area to provide upgraded fitness facilities and reception area at Time Capsule, Coatbridge.
Running Track & Changing Area Refurbishment, Grangemouth
Summary: Alteration and fit-out works to part of an operational stadium building to provide a replacement indoor running track and upgraded changing facilities.

Contact Us
Firth Road
Houstoun Industrial Estate
Livingston
West Lothian
EH54 5DJ
T: 01506 442233
E: action@maxiconstruction.co.uk