Summary: Phased office refurbishment and fit out works.
Description of Works: Phased refurbishment and fit out works to an operational office building to provide 700m2 of upgraded office facilities including a business centre, meeting rooms, tea prep and toilet areas.
Works included:
- Downtakings/strip-out
- Asbestos removal and encapsulation
- Roof repairs
- Partition walls
- Electrical & data installation
- Flooring including carpet tiles and vinyl
- Suspended ceilings and decoration
- Furniture including workstations, task chairs, monitor arms and storage cabinets
Attention to detail and design coordination was essential so that the works were completed within the phased and challenging timescales.
Added Value
- With budget constraints on the project we proposed that the ceiling frame be retained throughout and where necessary we retained existing ceiling tiles to complete repairs; this minimised replacement of new tiles to isolated rooms at 15% of the floor area.
- The removal and disposal of the bitumen based floor adhesive which contained asbestos used significant quantities of chemical product to dissolve the bitumen and created waste which had specific disposal requirements; the proposal to encapsulate the adhesive with a revised specification of floor screed, which was always required, reduced product used and waste with special disposal requirements.
Client Comments
“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”
“Thank you for your continued support in delivering the project, with another successful handover to our client. The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”
See more of our refurbishment projects
We have a wide range of projects like this one in our portfolio
Council Depot Livingston
Summary: External and internal alterations, extension and fit out of a former manufacturing facility to provide depot accommodation for local authority Departments including Building Services, Archives, Records Management and Museums and a Community Inclusion workshop.
St Catherine’s Retail Park Phases 2 and 3 Perth
Summary: Refurbishment works to retail units within a retail park in Perth.
Estates Office Refurbishment & Fit-out
Summary: Phased alteration and fit-out works

Contact Us
Firth Road
Houstoun Industrial Estate
Livingston
West Lothian
EH54 5DJ
T: 01506 442233
E: action@maxiconstruction.co.uk