Summary: Construction of a 400m² single storey extension within the grounds of the existing Primary School to provide a 4 classroom extension.

Description of Works:

Construction of a 400m² single storey extension within the grounds of the existing Primary School to provide a 4 classroom extension.

Works included:

  • Groundworks including utilities installation
  • Brick and blockwork
  • Concrete floor slab
  • Roof structure
  • Aluminium windows including circular windows and glazed entrance doors
  • Internal walls and partitions
  • Internal doors
  • Floor finishes including carpet tiles and vinyl
  • Wall and ceiling finishes including suspended ceilings and plasterboard ceilings
  • Mechanical and electrical installations including heating, power, photo voltaic panels on the roof, lighting, data, AV, security systems and ventilation
  • Toilet facilities
  • External works including ramped access

Community Benefits:

  • Construction safety education talk at the school
  • Donation of surplus materials, dried food items and soft toys to the school
  • Training for existing workforce included Temporary Works Coordinator , SSSTS, IPAF Dual, NPORS Vehicle Banksman and Emergency First Aid at Work training
  • Fully funded SSSTS and Emergency First At at Work training to sub contractors involved with the project
  • Work experience for a Year 3 Edinburgh University student

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”