Phases 3&4 Ogilvie School Campus
Location: Livingston
Summary: Phased refurbishment and extension to school campus
Description of Works:
Phased internal refurbishment and construction of two extensions at Ogilvie School Campus in Livingston, a school for primary and secondary pupils with significant social, emotional and behavioural needs.
Works included:
- The construction of 2 extensions to the existing school to provide 3 new classrooms and a general purpose room. The extensions feature facing brick walls to blend in with existing colours and rainscreen cladding.
- Internal refurbishment works throughout the majority of the existing school to provide new changing rooms, a soft play room, chill rooms, stores, support accommodation and refurbished/reconfigured toilets. The external envelope received new windows and doors with ramped access via resin bound gravel paths to provide level access around and into the building
- Refurbishment and fit-out works included:
- Metal stud partition walls
- Timber doorsets
- Wall and ceiling lining
- Acoustic wall lining and ceiling tiles
- Suspended ceilings
- Floor finishes including vinyl, sports flooring and carpet tiles
- Mechanical and electrical installations including lighting, power, data installation, access control and alarm systems
- Fixtures and fittings including a bespoke reception desk with glazed security screen, kitchen and toilet facilities and Nook pod seating booths.
- External works included new play areas and a fully refurbished and remodelled car park.
Community Benefits:
- Donation of dried food items in excess of £500 to local foodbank
- Training for existing workforce
See our Projects
See more of our education projects
We have a wide range of projects like this one in our portfolio