Summary: 554m2 timber-frame extension to an existing nursery
Description of Works:
This project, part of the Primary School & Early Years Bundle for Clackmannanshire Council delivered with hub East Central Scotland Limited, was for the design and construction of a new 554m2 timber-frame extension to an existing, operational nursery. The building provides playzones, kitchen, stores, toilets, office spaces and changing areas.
Works included:
- Groundworks
- Utilities connections
- Concrete floor slab
- Timber frame construction
- Rainscreen cladding and render to external walls
- Insulated steel-clad built-up roof system
- Timber alu-clad windows and doors and fixed rooflights
- Curtain walling
- Internal partition walls
- Glazed timber screens
- Suspended ceilings and acoustic panelling
- Mechanical and electrical installations including power, lighting, data, access control, alarm systems, air source heat pump, pv roof panels, windcatchers, underfloor heating and ventilation
- Internal finishes were of biophilic design for occupant connectivity to the natural environment. This featured in the FF+E colour palettes and natural oak vinyl flooring
- Fixtures and fittings included kitchen and toilet facilities.
- External works included hard and soft landscaping.
Added Value:
- We installed an Air Source Heat Pump which is sized to accommodate future expansion (either upgrading the older existing building or new build replacement).
- The ASHP required sound attenuation which was achieved by installing an acoustic barrier to prevent noise nuisance (we carried out an acoustic assessment to determine exactly what measures were required).
- We installed Photovoltaic panels on the roof with an internal display panel in the play space.
- We installed windcatcher ventilation passive stacks in the in the open plan areas
- Internally there are large sections of exposed roof construction in the play areas allowing the children to see how the roof is constructed.
Community Benefits:
- Repainted the façade of the existing building
- Supplied and installed blinds in the flexible area of the existing building
- Provided acoustic panels in the quiet room of the extension
See more of our education projects
We have a wide range of projects like this one in our portfolio
Workshop Upgrades, West College Scotland
Location: Clydebank
Summary: Reconfiguration and fit-out works within a college building
Summary: Reconfiguration and fit-out works within a college building
Roof & Fabric Repairs St Mary’s RC Primary School Leith
Location: Edinburgh
Summary: Roof & Fabric Repairs St Mary's RC Primary School Leith
Summary: Roof & Fabric Repairs St Mary's RC Primary School Leith
Teaching Space Refurbishment
Location: University of Edinburgh
Summary: Internal refurbishment works to teaching spaces
Summary: Internal refurbishment works to teaching spaces

Contact Us
Firth Road
Houstoun Industrial Estate
Livingston
West Lothian
EH54 5DJ
T: 01506 442233
E: action@maxiconstruction.co.uk