Phases 3&4 Ogilvie School Campus

Location: Livingston

Summary: 2 no. extensions and phased refurbishment works to an operational additional needs school campus.

Description of Works:

Phased internal refurbishment and construction of two extensions at Ogilvie School Campus in Livingston, a school for primary and secondary pupils with significant social, emotional and behavioural needs.

Works included:

  • The construction of 2 extensions to the existing school to provide 3 new classrooms and a general purpose room. The extensions feature facing brick walls to blend in with existing colours and rainscreen cladding.
  • Internal refurbishment works throughout the majority of the existing school to provide new changing rooms, a soft play room, chill rooms, stores, support accommodation and refurbished/reconfigured toilets.  The external envelope received new windows and doors with ramped access via resin bound gravel paths to provide level access around and into the building
  • Refurbishment and fit-out works included:
    • Metal stud partition walls
    • Timber doorsets
    • Wall and ceiling lining
    • Acoustic wall lining and ceiling tiles
    • Suspended ceilings
    • Floor finishes including vinyl, sports flooring and carpet tiles
    • Mechanical and electrical installations including lighting, power, data installation, access control and alarm systems
    • Fixtures and fittings including a bespoke reception desk with glazed security screen, kitchen and toilet facilities and Nook pod seating booths.
  • External works included new play areas and a fully refurbished and remodelled car park.

Community Benefits:

  • Donation of dried food items in excess of £500 to local foodbank
  • Training for existing workforce

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”