• Historic Buildings & Conservation

Let’s build together

Linlithgow Partnership Centre

Location: Linlithgow

Summary: Refurbishment and fit-out of a Grade B listed building to provide a hub for local community services.

Description of Works: The works comprised internal alterations, refurbishment and fit-out of the 2 and 3-storey Grade B listed County Buildings to provide a hub for local community services including a library, Customer Information Services (CIS), registrar, Police Scotland and local authority office accommodation.

Works included:

  • downtakings
  • structural alterations
  • masonry works
  • installation and refurbishment of existing door
  • refurbishment of existing sash and case windows
  • refurbishment of existing carvings
  • partition walls
  • mechanical and electrical works including Building Management System, new sanitaryware, replacement heating, power and lighting including lighting control, security systems (intruder, CCTV and access control), data installations, toilet facility for disabled persons
  • flooring including timber, carpet tiles and vinyl
  • ceiling works including new plasterboard and suspended ceilings, cornicing, plaster and decorative mouldings
  • wall finishes including wall tiling using salvaged Vitrolite tiles, glass tiles and ceramic tiles, plasterwork repairs and decoration works
  • fit-out works including new bespoke reception desks and alterations and repairs to existing desks, kitchen and toilet facilities
  • installation of new external escape stairs
  • installation of a new lift including the lift shaft
  • roof and lighting protection repair works
  • installation of new glass balustrades and alteration to existing balustrades
  • installation of new walnut timber panelling and doors to match existing within the Dalyell Suite to satisfy Historic Scotland and local authority planning requirements

Added Value:

  • At tender stage we proposed an alternative glass balustrading system as it became apparent that the fixing detail for the designed system could be insufficient. The alternative system provided cost savings
  • Careful removal of bespoke joinery finishes for reinstatement provided cost savings and retained existing features

Community Benefits:

  • 4-week high school student work placement

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”