• Education

Let’s build together

Family Centre Extension Whitburn

Location: Whitdale Primary School, Whitburn

Summary: Extension and alterations to family centre within an operational primary school

Description of Works: This project was for:

  • internal alterations to part of the existing family centre
  • single storey extension to the family centre
  • external works including the formation of a new vehicle turning area, footpaths and street lighting

Works included:

  • downtakings and strip-out works
  • structural alterations
  • substructure including concrete floor slab
  • timber frame extension
  • aluminium standing seam roof cladding
  • Trespa external wall cladding
  • aluminium/timber composite windows and screens
  • partition walls
  • internal doors and frames
  • glazed screens
  • mechanical and electrical works including new services installation, heating, ventilation, power, lighting, data comms, fire alarm and intruder alarm systems
  • wall finishes including plasterboard and ceramic tiling
  • vinyl floor finishes
  • plasterboard and suspended ceilings
  • painterwork
  • fixtures and fittings including kitchen, toilet cubicles, coat rack, shelving, pin boards and blinds
  • external works included drainage alterations, retaining wall, road crossing point with pedestrian barriers, footpaths, erection of lighting columns, palisade fence and grass turfing.

Community Benefits

  • some surplus site materials were donated to the Family Centre for their use.

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”