Refurbishment of South Morningside Primary School
Location: Edinburgh
Summary: Refurbishment of South Morningside Primary School
Description of Works: Refurbishment works to an operational, traditional primary school.
Maxi Construction has extensive experience in the construction, extension and refurbishment of education buildings in Scotland, including schools and universities. Most of these projects are undertaken whilst the facility remains operational requiring a high degree of planning and control in relation to health & safety and environmental factors.
Location: Edinburgh
Summary: Refurbishment of South Morningside Primary School
Description of Works: Refurbishment works to an operational, traditional primary school.
Location: Edinburgh
Summary: Refurbishment of Wardie Primary School
Description of Works: Alteration and refurbishment works to a well-established primary school which remained occupied throughout the works.
Location: Clackmannanshire
Summary: Design & build works to primary and early years facilities.
Description of Works: Design & build extension, refurbishment and construction works to primary schools and nurseries to form new and upgraded facilities.
Location: Menstrie
Summary: Menstrie Early Years Centre
Description of Works: Design and construction of a 585m² early years centre within an operational primary school
Location: Sauchie
Summary: Refurbishment of Craigbank Primary School
Description of Works: External & internal phased design & build refurbishment of operational primary school
Location: Edinburgh
Summary: Queensferry Primary School Extension
Description of Works: Construction of a 400m² single storey extension within the grounds of the existing Primary School to provide a 4 classroom extension.
Location: Edinburgh
Summary: Refurbishment of Clermiston Primary School
Description of Works: External & internal fabric upgrade and refurbishment of operational primary school
Location: Edinburgh
Summary: Refurbishment of St Mary's RC Primary School Leith
Description of Works: Internal refurbishment works to operational primary school
Location: Edinburgh
Summary: Roof & Fabric Repairs St Mary's RC Primary School Leith
Description of Works: External fabric repairs to operational primary school
Location: Alva
Summary: Alterations & Extension to Alva Primary School
Description of Works: Phased alterations & extension to operational primary school
Location: Edinburgh
Summary: Accessibility Works Ashworth Laboratories
Description of Works: Accessibility improvement works to an operational Grade B listed university building
Location: Edinburgh
Summary: Social Space Refurbishment
Description of Works: Alteration and refurbishment works to part of an operational Grade B listed university teaching building to create student social space.
Location: Whitburn
Summary: Extension to Family Centre
Description of Works: Construction of a single storey extension to the family centre, internal alterations to part of the existing family centre together with external works to form a new vehicle turning area.
Location: Blackridge
Summary: Games hall extension and internal alterations to operational primary school
Description of Works: Construction of extension to provide a games hall, changing accommodation, entrance and reception area together with alterations to allow disabled access throughout the various levels of the school.
Location: University of Edinburgh
Summary: Internal refurbishment works to teaching spaces
Description of Works: Refurbishment of 10 teaching spaces within an operational Grade B listed university building
Location: Kirknewton
Summary: Internal refurbishment and reconfiguration of a primary school
Description of Works: Refurbishment and reconfiguration of a traditional primary school building including the provision of disabled access.
Location: Edinburgh
Summary: Construction of classroom blocks at 3 Edinburgh primary schools.
Description of Works: The construction of 4 new single and 2-storey classroom blocks providing additional floorspace of 1250m² within 3 operational Edinburgh Primary Schools.
Location: Lanark
Summary: Redevelopment of dilapidated farm buildings to provide a training facility.
Description of Works: Refurbishment and extension of dilapidated farm buildings to provide a new community training workshop, exhibition space, office/meeting accommodation, changing facilities, conference room, catering/kitchen facilities and toilets.
Location: Helensburgh
Summary: Extension and alterations to operational primary school.
Description of Works: Construction of a single storey, timber frame extension providing 2 classrooms, a drama room, music room, staff room and toilets together with alterations within the school to provide upgraded staff toilet areas and the formation of a new resource store.
John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk
Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk
Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk