Summary: Alterations and extensions to operational sports centre for West Lothian Leisure.

Description of Works: Phased alterations, extension and refurbishment works to an operational sports centre to provide a state of the art facility including gym, fitness studios, changing and toilet facilities, soft play, reception, offices and communal areas.

Works included:

  • Downtakings and strip-out
  • Replacement of wall cladding and roof finishes to sections of the existing building
  • Construction of a 550m2 steel-frame extension to the rear of the Centre to form a new Gym featuring 120 pieces of new kit
  • Construction of a single storey extension to the front of the Centre to form a new entrance and reception area.
  • General fitting out of the existing building and new extensions, comprising:
    • Load bearing and non-loadbearing metal stud partition walls
    • Solid core door sets; glazed internal screens
    • Shopfitting to Reception and Office areas; kitchen fitments; barrier entry control system; lockers to staff and changing rooms; display panels, shelving; internal signage
    • Contractor designed mechanical services installation
    • Contractor designed electrical installations, protective and communications installations

Added Value

Review of lighting scheme to provide alternate solution to feature lighting maintaining importance of the feature but reducing the cost.  Review of ventilation proposals to provide alternative solution to gym ventilation, again to maintain performance but reduce cost.

Community Benefits

Provided Work Experience Placements for students from West Lothian College.

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”