• Community

Let’s build together

Craigsfarm Community Hub Livingston

Location: Livingston

Summary: New community facility

Description of Works: Partial demolition of an existing building and construction of a 592m2 single storey building providing reception, offices, meeting rooms, multi-purpose halls, kitchen, café, and toilet facilities.

Works included:

  • demolition/downtakings
  • asbestos removal
  • groundworks
  • substructure
  • steel frame
  • concrete floor slab
  • timber roof structure clad with black profiled fibre cement roofing and featuring rooflights/velux windows
  • external cavity walls featuring clay facing brickwork, timber framed panels, timber shutters and metal louvre
  • UPVC windows and timber entrance doors
  • curtain walling
  • internal walls and partitions including acoustic operable walls
  • glazed screens and doors
  • floor finishes including battened wood floating floor, carpet tiles and vinyl
  • wall and ceiling finishes including suspended ceilings and altro cladding
  • painterwork
  • mechanical and electrical installations including heating, power, photo voltaic installation, lighting, data, security systems, ventilation, CCTV, access control and interface with BMS
  • fixtures and fittings including kitchen, staff  tea points, reception desk and toilet facilities
  • external works including hard and soft landscaping, boundary walls, fencing and gates

Community Benefits

  • toys offered to the nursery adjacent to the site
  • liaison with Developing the Young Workforce West Lothian including attendance at local events

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”