Classroom Blocks Edinburgh

Location: Edinburgh

Summary: Construction of classroom blocks at 3 Edinburgh primary schools.

Description of Works: The construction of 4 new single and 2-storey classroom blocks providing additional floorspace of 1250m² within 3 operational Edinburgh Primary Schools.

Works included:

  • HV Cable and Virgin Media diversions
  • Reduced level excavation
  • Drainage work & connection to existing sewers
  • Concrete floor slab
  • Timber frame
  • Standing Seam Roof
  • Windows and doors
  • Internal fit-out works including dry-lining, joinery and decoration works
  • M&E installations
  • External works and landscaping

Added Value

Due to limited site space we opted to use an offsite fabrication solution for the roof sheets. The completion of 5 buildings with identical roofing defined the most cost effective procurement of the Kalzip Roof was to have the bulk materials delivered as a coil and then rolled to the required profile and length. As the site locations prevented sufficient access for this fabrication facility we completed the works within the grounds of our head office, segregated the finished materials for each school and delivered them on a just in time basis; this provided minimal disruption to the sites, negated damage from materials being stored on a congested site and provided the Client with the most cost effective solution.

Community Benefits Provided

  • 2 new starts
  • 2 school placements
  • 1 NVQ start

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”