Building 01 District 10 Dundee

Location: Dundee

Summary: New build office building using recycled shipping containers.

Description of Works: Construction of a 3-storey office building providing approximately 950m2 of space using recycled shipping containers for Scottish Enterprise. Registered with the Considerate Constructors Scheme the project received a Certificate of Performance Beyond Compliance and was delivered to BREEAM ‘Excellent’ standard and within the ethos of the Dundee Waterfront ‘BREEAM Sustainable Communities’ bid.

The building provides:

  • 15 no. 38m2 offices with tea prep facilities
  • 1 no. 31m2 office
  • a communal kitchen/common room
  • a meeting room

Works included:

  • new access road, car parking, pavements
  • new sub-station and services infrastructure
  • a building shell constructed from recycled shipping containers with heavily insulated and sealed wall, roof and floor linings
  • Sarnafil polymeric roof
  • a central steel self-supporting stairwell
  • mechanical and electrical services including a passenger lift and roof-top pv panels

Challenges

  • Achieving the required BREEAM credits. Site registered with the Considerate Constructers Scheme with aim to achieve minimum score of 32 (exceeded on 2 audits), responsible sourcing of timber from FSC suppliers, use of recycled aggregates and effective management of site impacts e.g. waste, energy, water consumption and transport.   SWMP encouraged reduction, re-use and recycling of materials and identified target for non-hazardous waste not to exceed 3.2 tonnes or 3.4m2 per 100m2.
  • Revised drainage layout required due to the drainage impact assessment being re-assessed and showing a risk of flooding. Revised drainage designs were concluded and approved for use.

Sustainability

Registered with the Considerate Constructors Scheme the project received a Certificate of Performance Beyond Compliance and was delivered to BREEAM ‘Excellent’ standard and within the ethos of the Dundee Waterfront ‘BREEAM Sustainable Communities’ bid.

Awards

  • 2014 Scottish Design Awards: Commendation for Architecture: Commercial/ Offices Building or Project
  • 2014 Dundee Civic Trust Awards: Commendation for its outstanding contribution to the townscape of Dundee
  • 2014 Dundee Institute of Architects: Best Commercial Building, award for Interior Design and the Supreme Award for best overall project.

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”