• Sports and Leisure

Let’s build together

Alterations to Time Capsule Coatbridge

Location: Coatbridge

Summary: Refurbishment and alterations to existing dry sports area to provide upgraded fitness facilities and reception area at Time Capsule, Coatbridge.

Description of Works: Refurbishment and alterations to 3 levels of the existing dry sports area to provide upgraded fitness facilities including:

  • gym containing:
    • over 250 brand new pieces of kit
    • 60 pieces of state of the art cardio equipment (treadmills, cross trainers, bikes, rowers, tread climbers and step mill)
    • over 50 resistance machines
    • huge range of free weights including Olympic weightlifting platforms
    • brand new functional training area with a rig and brand new training equipment (including tyres, kettlebells and TRX)
  • dance studios
  • soft play area
  • café
  • reception area
  • extension to form a new entrance area.

Works included:

  • structural alterations
  • structural steelwork
  • partition walls, glazed screens and wood doorsets
  • mechanical and electrical works including strip-out, power, lighting, data comms, air handling units, air conditioning system, PA system, access control, fire and security systems and CCTV
  • flooring including vinyl, carpet tiles and Junckers strip wood
  • suspended ceilings
  • wall finishes including painterwork and ceramic tiling

Added Value

Value engineering advice provided during the project resulted in cost savings for the Client of around £25k in the following areas:

  • Alternative specification for AHU
  • Alternative controls sub contractor to the one specified
  • Specification change to suspended ceiling grid changing from anti corrosion to standard grid in areas where moisture was not an issue
  • Omitted screed to new first floor by increasing level of finished slab

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”