Administration & Welfare Block

Location: Ayr

Summary: New build 2-storey office and welfare building.

Description of Works: Construction of an 844m2 2-storey building, within an operational local authority cleansing depot, to provide office space, meeting rooms, training suite, mess room, locker room, storage and toilet and shower facilities.

Works included:

  • Utility connections
  • Foundations and drainage
  • Concrete floor slab
  • Structural steel frame
  • Metal profiled wall and roof cladding
  • Metal stud partition walls
  • Aluminium windows and doors
  • Timber internal doors and screens
  • Suspended ceilings
  • Mechanical and electrical works including LTHW hot water heating comprising biomass boiler, ventilation, power, lighting, data comms, access control, platform lift and alarm systems
  • Wall finishes including plasterboard and cladding panels
  • Floor finishes including carpet and vinyl
  • Painterwork
  • Fixtures and fittings including kitchen and tea prep areas, lockers and benches, toilets and showers, shelving and blinds
  • External works included car parking and vehicle yard

For more information please contact us

See our projects

Contact Us

John

John C Aitchison
Managing Director
E: johnaitchison@maxiconstruction.co.uk

Barry

Barry Simpson
Construction Director
E: barrysimpson@maxiconstruction.co.uk

Claire

Claire MacKenzie
Marketing Manager
E: clairemackenzie@maxiconstruction.co.uk

Contact us or call on 01506 442233

This important and challenging project

“This important and challenging project has been completed quietly, efficiently and professionally without any fuss."

Well done

“Well done in completing the first phase of the works, on programme and with zero snagging. The client is delighted with the end product which has exceeded their expectations.”

The building is impressive

"I would like to pass on the thanks of the whole school to everyone involved in what was a well-managed, well communicated and safely delivered project.”

The handover of Phase 2

“The handover of Phase 2 a day early has assisted the client to better manage their move management on two projects which occur over the same weekend, an effort which is greatly appreciated.”